1)Factory Layout Plan Approval under DISH as per The Factories Act 1948
2)Obtaining Permanent Factory Licence under DISH as per The Factories Act 1948
3) Factory Licence Renewal under DISH as per The Factories Act 1948
4)Statutory Testing of Lifting Equipments and Lifting Tackles and Certification in Form - 11
5)Statutory Testing of Pressure Vessels and Certification in Form - 13
6)Safety Audit as per Maharashtra Factories Safety Audit Rules, 2014
7)Stability Certificate as per The Maharashtra Factories Rules 1963
8)Hazard Identification and Risk Analysis (HIRA)
9)Job Safety Analysis (JSA)
10)Maximum Credible Loss Scenario (MCLS)
11)On Site Emergancy Plan (ONEMP)
13)Quantitative Risk Analysis (QRA)
14)Fire Load Calculations & Fire Safety Audit Report
15)Fire Protection System Audit Report in Form - B
16)Site Notification Report as per The Maharashtra
Factories (Control of Industrial Major Accident Hazards) Rules 2003
17)Safety Report as per The Maharashtra
Factories (Control of Industrial Major Accident Hazards) Rules 2003
18)Statutory Testing of Power Press Machines and Certification in Form - 9B as per The Maharashtra Factories
Rules 1963
19)Centrifuge Machines Inspection as per The Maharashtra Factories Rules 1963
20)Storage Tank Testing as per The Maharashtra Factories Rules 1963
21)Thermic Fluid Oil Analysis as per The Maharashtra Factories Rules 1963
22)Safety Relief Valve Testing
23)Goods Lift, Material Handing Lift, Hoist Servicing Annual Maintenance Contract
24)Serviciing of Lifting Tackles such as Chain Pulley Blocks
25)Supply of Customise Fabricated Lifting Tackles such as lifting beams.
26)Calibration Of Pressure Gauge, Vacuum Gauge, Temperature Gauges, Temperature Indicator